| - |
Tools and Equipment In Context |
Tools and Equipment In Context |
Tools and Equipment In Context |
| - |
Organizes Work In Context |
Organizes Work In Context |
Organizes Work In Context |
| - |
- |
Routine Trade Activities In Context |
Routine Trade Activities In Context |
| - |
Communication Techniques In Context |
Communication Techniques In Context |
Communication Techniques In Context |
| - |
Tube, Tubing, Pipe (Preparation) In Context |
Tube, Tubing, Pipe (Preparation) In Context |
Tube, Tubing, Pipe (Preparation) In Context |
| - |
Tube, Tubing, Pipe (Join) In Context |
Tube, Tubing, Pipe (Join) In Context |
Tube, Tubing, Pipe (Join) In Context |
| - |
- |
- |
Interior Drainage, Waste and Vent (DMV) Systems In Context |
| - |
- |
- |
Water Services In Context |
| - |
- |
- |
Potable Water Distribution In Context |
| - |
- |
- |
Hydronic Systems In Context |
| - |
- |
Plumbing Fixtures and Appliances In Context |
Plumbing Fixtures and Appliances In Context |
Safety-Related Functions
- Maintains safe work environment
- Uses personal protective equipment (PPE) and safety equipment
- 1.03 Performs lock-out and tag-out (LOTO) procedures
|
- |
- |
- |
Tools and Equipment
- 2.01 Uses common tools and equipment
- 2.02 Uses access equipment
- 2.03 Uses rigging, hoisting, lifting and positioning equipment
- 2.04 Rigs loads for cranes
- 2.05 Uses welding equipment
- 2.06 Uses soldering and brazing equipment
|
- |
- |
- |
Organizes Work
- 3.01 Organizes project tasks and procedures
- 3.02 Organizes materials and supplies
- 3.03 Uses documentation
|
- |
- |
- |
Routine Trade Activities
- 4.01 Plans layout for piping systems
- 4.02 Calculates tube, tubing and pipe lengths
- 4.03 Installs piping supports
- 4.04 Installs piping sleeves
- 4.05 Commissions systems (Introduction)
- 4.06 Protects piping systems, equipment and structure from damage
- 4.07 Coordinates excavation and backfilling of trenches
- 4.08 Installs fire stopping devices and materials
|
Routine Trade Activities
- 4.01 Plans layout for piping systems
- 4.02 Calculates tube, tubing and pipe lengths
- 4.03 Installs piping supports
- 4.04 Installs piping sleeves
- 4.05 Commissions systems
- 4.06 Protects piping systems, equipment and structure from damage
- 4.07 Coordinates excavation and backfilling of trenches
- 4.08 Installs fire stopping devices and materials
|
- |
- |
Communication Techniques
- 5.01 Uses communication techniques
|
- |
Mentoring Techniques
- 5.02 Uses mentoring techniques
|
Mentoring Techniques
- 5.02 Uses mentoring techniques
|
Tube, Tubing and Pipe Preparation
- 6.01 Inspects tube, tubing, pipe and fittings before installation
- 6.02 Cuts tube, tubing and pipe
- 6.03 Bends tube, tubing and pipe
- 6.04 Prepares tube, tubing and pipe connections
|
- |
- |
- |
Tube, Tubing and Pipe (Join)
- 7.01 Joins copper tube, tubing and pipe
- 7.02 Joins plastic tube, tubing and pipe
- 7.03 Joins steel tube, tubing and pipe
- 7.04 Joins cast iron pipe
- 7.05 Joins specialized tube, tubing and pipe
|
- |
- |
- |
| - |
- |
Sewers
- 8.01 Plans layout and sizes piping for sewers
- 8.02 Installs maintenance holes and catch basins
- 8.03 Installs piping for sewers
- 8.04 Tests maintenance holes, catch basins and piping for sewers
- 8.05 Services maintenance holes, catch basins and piping for sewers
|
- |
| - |
- |
- |
Sewage Treatment Systems
- 9.01 Plans installation of sewage treatment systems
- 9.02 Installs components for sewage treatment systems
- 9.03 Tests sewage treatment systems
- 9.04 Services sewage treatment systems
|
Interior Drainage, Waste and Vent (DWV) Systems (Introduction)
- 10.01 Plans layout and sizes piping for interior drainage waste and vent (DWV) systems
- 10.02 Installs underground piping and components for interior drainage, waste and vent (DWV) systems
- 10.03 Installs above-ground piping and components for interior drainage, waste and vent (DWV) systems
- 10.04 Tests interior drainage, waste and vent (DWV) systems
- 10.05 Services interior drainage, waste and vent (DWV) systems
|
Interior Drainage, Waste and Vent (DWV) Systems
- 10.01 Plans layout and sizes piping for interior drainage waste and vent (DWV) systems
- 10.02 Installs underground piping and components for interior drainage, waste and vent (DWV) systems
- 10.03 Installs above-ground piping and components for interior drainage, waste and vent (DWV) systems
- 10.04 Tests interior drainage, waste and vent (DWV) systems
- 10.05 Services interior drainage, waste and vent (DWV) systems
|
Interior Drainage, Waste and Vent (DWV) Systems
- 10.01 Plans layout and sizes piping for interior drainage waste and vent (DWV) systems
- 10.02 Installs underground piping and components for interior drainage, waste and vent (DWV) systems
- 10.03 Installs above-ground piping and components for interior drainage, waste and vent (DWV) systems
- 10.04 Tests interior drainage, waste and vent (DWV) systems
- 10.05 Services interior drainage, waste and vent (DWV) systems
|
- |
| - |
- |
Water Services
- 11.01 Plans layout and sizes piping and components for water service
- 11.02 Installs piping for water service
- 11.03 Installs components for water service
- 11.04 Tests water service piping and components
- 11.05 Services water service piping and components
|
- |
| - |
- |
Potable Water Distribution
- 12.01 Plans layout and sizes piping and components for potable water distribution systems
- 12.02 Installs piping for potable water distribution systems.
- 12.03 Installs components for potable water distribution systems
- 12.04 Installs cross connection controls
- 12.05 Tests potable water distribution systems
- 12.06 Services potable water distribution systems
|
- |
| - |
- |
- |
Private Water Pressure Systems
- 13.01 Plans layout and sizes piping and components for private water pressure systems
- 13.02 Installs piping for private water pressure systems
- 13.03 Installs components for private water pressure systems
- 13.04 Tests private water pressure systems
- 13.05 Services private water pressure systems
|
| - |
Plumbing Fixtures and Appliances
- 14.01 Installs fixture supports
- 14.02 Installs plumbing fixtures and appliances
- 14.03 Tests plumbing fixtures and appliances
- 14.04 Services plumbing fixtures and appliances
|
- |
- |
| - |
- |
- |
Water Treatment Systems Footnote *
- 15.01 Sizes water treatment systems
- 15.02 Installs water treatment systems
- 15.03 Tests water treatment systems
- 15.04 Services water treatment systems
|
| Task 16 – Not Common Core |
| - |
Piping and Components for Hydronic Systems
- 17.01 Plans layout and sizes piping and components for hydronic systems
- 17.02 Installs piping and components for hydronic systems
- 17.03 Tests hydronic systems
- 17.04 Services hydronic systems
|
Piping and Components for Hydronic Systems
- 17.01 Plans layout and sizes piping and components for hydronic systems
- 17.02 Installs piping and components for hydronic systems
- 17.03 Tests hydronic systems
- 17.04 Services hydronic systems
|
- |
| - |
Hydronic Heating and Cooling Equipment
- 18.01 Installs hydronic heating equipment
- 18.02 Installs hydronic cooling equipment
- 18.03 Tests hydronic heating and cooling equipment
- 18.04 Services hydronic heating and cooling equipment
|
Hydronic Heating and Cooling Equipment
- 18.01 Installs hydronic heating equipment
- 18.02 Installs hydronic cooling equipment
- 18.03 Tests hydronic heating and cooling equipment
- 18.04 Services hydronic heating and cooling equipment
|
- |
| - |
- |
- |
Process Piping Footnote **
- 19.01 Plans layout and sizes piping and components for process piping systems
- 19.02 Installs piping for process piping systems
- 19.03 Installs components for process piping systems
- 19.04 Tests process piping systems
- 19.05 Services process piping systems
|
| Task 20 – Not Common Core |
| - |
- |
Other Specialized Systems
- 21.01 Plans layout and sizes piping, components and equipment for other specialized systems
- 21.02 Installs piping and components for other specialized systems
- 21.03 Installs equipment for other specialized systems
- 21.04 Tests other specialized systems
- 21.05 Services other specialized systems
|
Other Specialized Systems
- 21.01 Plans layout and sizes piping, components and equipment for other specialized systems
- 21.02 Installs piping and components for other specialized systems
- 21.03 Installs equipment for other specialized systems
- 21.04 Tests other specialized systems
- 21.05 Services other specialized systems
|